Sunday 18 September 2011

Garmants Inspection


1. Confirmation of Quantity:
First step of inspection start with confirmation of  Quantity with the vendors  packing list by counting all Pecs. Of each box. If Qty is not matching to the packing list and written in the box then this discrepancy is informed to the vendor.



2. Confirmation of accessories:   Next step is the confirmation of accessories, here we confirm brand tags, demerit tags, Price tags, or other tags, wash care labels, woven labels, or other labels and accessories as required by the buyer.

3. Size spec inspection :  After confirmation of accessories all pcs are checked as per size spec based on the instruction sheet which is given by the buyer side. If  any measurement problem is noticed then we check the original sample and inform the buyer same time.

4. In side Inspection :  At this stage garment is checked  from reverse side to ensure that there is no fabric defect, poor stitching, and stains etc in the garment.


5. Out side Inspection:  At this stage garment is checked  from  outside to ensure that there is no  color variation, weaving defect, fabric defect, printing defect, holes, poor stitching, bad smell , dying defect and stains etc in the garment.


6. Final Inspection:  Final Inspection stage is the most important part of inspection process, here garment is rechecked to confirm that inspection is done properly without missing any checking step if any defect is noticed  we  put it into  rejection bin or send it for repay. 

7. Packing:   All “Grade-A” goods are put back into  poly bags as per the original packaging  and then they are send for needle inspection .

So, depending on the quality of defect some garments are send for repair and some are rejected.

No comments: